Our team has been involved in the following projects.
Energotehnika Južna Bačka d.o.o. Novi Sad
Serbia, 2024 - ongoing
WWTP – Municipalitie of Pećinci
Tasks: Preparation of technical documentation for all levels of design (Conceptual Design / Preliminary design / Design for Construction permit / Design for execution of works)
DOT NETWORKS d.o.o. Beograd
Serbia, 2024 - ongoing
WWTP – Municipalitie of Apatin
Tasks: Preparation of technical documentation for all levels of design (Conceptual Design / Preliminary design / Design for Construction permit / Design for execution of works)
Energotehnika Južna Bačka d.o.o. Novi Sad
Serbia, 2024 - ongoing
WWTP – Municipalitie of Bečej
Tasks: Preparation of technical documentation for all levels of design (Conceptual Design / Preliminary design / Design for Construction permit / Design for execution of works)
JADRAN d.o.o. Beograd
Serbia, 2024 - ongoing
WWTP – Municipalitie of Bela Palanka
Tasks: Preparation of technical documentation for all levels of design (Conceptual Design / Preliminary design / Design for Construction permit / Design for execution of works)
Bottega Grande d.o.o. Beograd
Serbia, 2024
Design services for construction of commercial catering system Bottega
Tasks: Preparation of technical documentation for all levels of design (Conceptual Design / Preliminary design / Design for Construction permit / Design for execution of works) Design supervision service during execution
Municipality of Požega
Serbia, 2021-2022
Municipal Waste Transfer Station for municipalities of Požega, Arilje, Kosjerić and Lučani
Tasks: Project Management plus designing – All levels of design, from Conceptual design to Detail design (Technological part, Architectural design, Electrical part, etc.)
SMURFIT KAPPA d.o.o. Beograd
Belgrade, Serbia, 2020-2022
Industrial WWTP
Tasks: Preparation of technical documentation for all levels of design (Conceptual Design / Preliminary design / Design for Construction permit / Design for execution of works)
UTVING VS d.o.o. Beograd / Eptisa
Belgrade, Serbia, 2021-2022
DWTP "Jezero" (1m3/s) – Makiš
Tasks: Review of the existing design documentation, preparation of the Conceptual design for the Plant improvement/upgrade, tender dossiers preparation, PIU support and procurement of works and works contract Supervision
Note: Financed by EBRD
Ehting d.o.o. Beograd / Metito
Zrenjanin, Serbia, 2021-2022
WWTP Zrenjanin (88.000 PE)
Tasks: Designing of the electrical part of WWTP including the telecommunications and I&C installations (fire detection system, gas detection system, telephone and network system, video surveillance system and access control system and installation) plus structure design DBOT Project
UNIHA Wasser Technologie
Kikinda, Serbia, 2021-2022
DWTP Kikinda (150 l/s)
Tasks: Detail mechanical design of the Plant, including 3D modeling
Messer Tehnogas d.o.o.
Bor, Serbia, 2021-2022
ASU 3 – Bor Providing of Engineering services (Construction management) for Air Separation Unit – ASU 3 at Messer Tehnogas plant – Bor
Lindner d.o.o. Beograd
Belgrade, Serbia, 2020-2021
Design services for "Vila Banjica" Project, Plot 5 and Plot 6
Tasks:
- Conceptual solution (IDR) for plot 6
- Building permit project (PGD) for plot 5 and plot 6
- Design for Construction (PZI) for plot 5 and plot 6
TAHAL B.V. Group
Serbia, 2019-2021
Preparation of design documentation for wastewater treatment plants in Serbia for the Ministry of Environment protection, Republic of Serbia
Tasks - preparation of all levels of documentation for development of projects in Environment sector:
- All levels of design (from Conceptual Design to Design for Construction) for WWTP Pećinci, capacity 8.800PE
- All levels of design (from Conceptual Design to Design for Construction) for WWTP Lapovo, capacity 10.000PE
- Feasibility study and all levels of design (from Conceptual Design to Design for Construction) for WWTP Bela Palanka, capacity 10.000PE
- Feasibility study and all levels of design (from Conceptual Design to Design for Construction) for WWTP Backa Palanka, capacity 50.000PE with nutrients removal and anaerobic digestion of sludge with biogas utilisation
- Feasibility study and all levels of design (from Conceptual Design to Design for Construction) for WWTP Apatin, capacity 28.000PE with nutrients removal and anaerobic digestion of sludge with biogas utilisation
- Feasibility study and all levels of design (from Conceptual Design to Design for Construction) for WWTP Priboj, capacity 20.000PE with nutrients removal
PUC "Drugi Oktobar"
Vršac, Serbia, 2019-2020
Water treatment plant for municipality of Vršac, capacity 300l/s
Tasks: Engineering services – providing of service for regular and extraordinary maintenance of drinking water treatment plant Pavliš – Vršac
FCA (Fiat Chrysler Automobiles) Serbia
Kragujevac, Serbia, 2020
WWTP "Katak I", "Katak II" and "Katak III"
Tasks: Engineering services – providing service for regular and extraordinary maintenance of waste water treatment plants in FCA Kragujevac – extension of contract for another 2 years
Messer Tehnogas d.o.o., Belgrade
Smederevo, Serbia, 2019
Air Separation Plant (ASU) Smederevo
Tasks: As-built state of all process pipelines and producing of P&ID diagrams, for the "old" part of plant
Al Rawafed Srbija d.o.o.
Vojvodina, Serbia, 2014-2019
Serbian Irrigation Project
Task: Revitalization of existing and development of new systems for irrigation to 14,000 hectares belonging to agricultural enterprises that are in restructuring
Consortium: p2m berlin GmbH & Ehting d.o.o., Belgrade
Belgrade, Serbia, 2019
Batajnica Wastewater Collection and Treatment Project
Tasks: Preparation of Feasibility study, EIA study and all levels of design
Note: Financed by EBRD
Aqualia infraestructuras d.o.o. Beograd - Vračar
Vršac, Serbia, 2019
Water treatment plant for municipality of Vršac, capacity 300l/s
Tasks: Performing of engineering activities and duties related to process, mechanical, civil, architectural and electrical part and SCADA on behalf of Aqualia during DNP
Aqualia infraestructuras d.o.o. Beograd - Vračar
Vršac, Serbia, 2018
Water treatment plant for municipality of Vršac, capacity 300l/s
Tasks: Consultancy services – providing engineering services as Site manager of the Contractor and Licensed Contractor
Note: Project funded by KFW
P2m Berlin GmbH
Kostolac, Serbia, 2017-2018
Supervision of Construction and Commissioning of the New WWTP in TPP Kostolac B in the Republic of Serbia
Tasks: Consultancy services – providing engineering services as Team Leader of FIDIC Engineer Project team
Public Utility "Regional Water Supply of Montenegrin coast"
Cetinje, Montenegro, 2011
Reconstruction and monitoring of Cetinje water supply system
Tasks:
- Technical solutions provided by team of experts for the reconstruction of water supply system
- Management of all construction activities and task
Beohamex, Tivat, Montenegro
Budva, Montenegro, 2011
Reconstruction of hotel "Avala", Budva, Montenegro
Task: Technical solutions and needed details were provided for this type of facility by experienced engineering team
UNDP, Podgorica, Montenegro
Danilovgrad, Montenegro, 2010
Reconstruction of military base "Taraš", Danilovgrad, Montenegro
Task: Subcontracted by former Serbian company "Projektomontaža", team members were responsible for finding technical solutions needed for a proper reconstruction of perimetric protection
SMATSA, Belgrade, Serbia
Podgorica, Montenegro, 2009
Reconstruction and upgrading of Terminal Air Traffic Control "Podgorica", Montenegro
Task: Engineers were involved in managing reconstruction and upgrading of the air terminal
Mali kolektiv, Belgrade, Serbia
Belgrade, Serbia, 2007-2008
Construction of residental and commercial building, 24.000m2, "B2-Terazije terrace", Belgrade, Serbia
Task: Team assembled of various engineering professionals offered intelligent and integrated infrastructure solutions providing confort, energy efficiency, safety and security of the residential/commercial building